Kansai International Airport Terminal 1 International Lounge "KIX Lounge Kansai"

関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」6
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」1
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」2
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」3
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」4
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」5
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」6
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」1
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」1
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」2
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」3
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」4
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」5
関西国際空港第1ターミナルビル 国際線ラウンジ「KIX Lounge Kansai」6
overview

In preparation for the 2025 Osaka-Kansai Expo, renovation work on the Kansai International Airport's Terminal 1 building has been underway since 2021. As the gateway to Kansai, the project aims to "expand international flight capacity," "enhance the airside area," and "improve the passenger experience." Until now, the airport had lounges for each airline, but these have been consolidated into one, providing a larger space through more efficient use of space.

Of these, this project corresponds to Phase 3 of the large-scale renovation, and is an international business lounge with a total area of 2,970 m2 and a seating capacity of 658, themed on "ancient capitals and cities." The building is divided into two areas with different concepts, "North Side" and "South Side."
schematic design was done by Azusa Sekkei, and our company was in charge of interiors (FF&E), working drawings and construction of the facilities, and art supervision.

Issues/requests

① Shortening of construction period
2) Measures to address issues unique to airports (ensuring ceiling height/adjusting floor unevenness)
③ Guarantee of high quality

There were more requests than this.

solution

In response to your request, we made the following ideas and proposals.

(1) Shortening of construction period
・Proposal of material changes that do not impair design with an eye on shortening the construction period
・Improvement of construction performance by changing the type of equipment pipe
・Proactive process coordination and cooperation with related companies

(2) Measures to address issues unique to airports (securing ceiling height / adjusting floor non-land)
・Utilization of the latest technology (3D scanning to photograph the site and verify the level settings of each location on the data)
・Communicate closely with the main body contractor to adjust the mounting position of equipment and equipment to ensure the maximum ceiling height.

(3) Guarantee of high quality
・Sharing of completed images by holding small mockup confirmation sessions
・Inspection of imported fixtures by customers and design companies

The customer and related companies worked together to think about "what can be done", discussed it, and were able to complete the construction.

project member
Sales and project management
Sho Sugaya, Tomoki Hiura, and Riku Shinkawa
design
Katsumi Tanden, Satoshi Okazaki, Shinji Satose, Eiji Watanabe, Yu Watanabe, and Yuki Tanaka
construction
Motoi Kimura, Keisuke Kobayashi, Satoshi Utsunomiya, Hiroshi Onishi, Mayu Kobayashi
Basic information
open

2025

location

Osaka Prefecture

client

Kansai Airports

solution

working drawings, environmental features, building execution

Facility and employee information is current as of the time of opening. Please see the facility's website for the latest information.

What's NewSearch by new achievements

  • TOP
  • Achievements
  • Kansai International Airport Terminal 1 International Lounge "KIX Lounge Kansai"
PAGE TOP
Contact us

Please contact us using the button below if you have an inquiry, want to request a quote or request documents.
We have created a separate “FAQ page” that lists the most common questions we are asked.
Please take a look at this page if you have a question.