JW Marriott Hotel Tokyo

JWマリオット・ホテル東京6

Image courtesy of JR East (forward stroke photography)

JWマリオット・ホテル東京1

Image courtesy of JR East (forward stroke photography)

JWマリオット・ホテル東京2

Image courtesy of JR East (forward stroke photography)

JWマリオット・ホテル東京3

Image courtesy of JR East (forward stroke photography)

JWマリオット・ホテル東京4

Image courtesy of JR East (forward stroke photography)

JWマリオット・ホテル東京5

Image courtesy of JR East (forward stroke photography)

JWマリオット・ホテル東京6

Image courtesy of JR East (forward stroke photography)

JWマリオット・ホテル東京1

Image courtesy of JR East (forward stroke photography)

JWマリオット・ホテル東京1
JWマリオット・ホテル東京2
JWマリオット・ホテル東京3
JWマリオット・ホテル東京4
JWマリオット・ホテル東京5
JWマリオット・ホテル東京6

overview

TAKANAWA GATEWAY CITY, a neighborhood directly connected to JR Takanawa Gateway Station, and THE LINKPILLAR 1 SOUTH, a skyscraper located directly in front of the station, boast an outstanding location with excellent access to not only major areas of central Tokyo, but also Haneda and Narita airports and Shinagawa Station.
The JW Marriott Hotel Tokyo, located on the 23rd to 30th floors of the same building, is the second JW Marriott brand hotel in Japan, named after founder J. Willard Marriott, and is one of the most prestigious brands among the more than 30 brands operated by Marriott International.

Our company was responsible for interiors construction of public areas such as the lobby, restaurant and bar, pool, and banquet hall of the JW Marriott Hotel Tokyo, which had its grand opening on October 2, 2025.
To embody concept design of Yabu Pushelberg, an internationally acclaimed concept design studio that has worked on many luxury hotels, including Marriott, we worked together with project management and local architects over a period of just over three years.

Issues/requests

1. Value engineering proposals from a wide range of perspectives
2. Ensuring the quality of Yabu Pushelberg's concept design
3. Coordination of construction schedules and schedules with other construction work

There was a request above.

solution

1. We made a wide range of value engineering proposals, including considering the replacement of each material and materials, working on new products, and proposing methods to be used in other fields.
2. While always being aware of concept design, construction, and maintainability, we created construction drawings, which are detailed drawings to be realized, and communicated closely with interior designers and local architects to ensure quality.
3. In response to various construction period and process changes, we secured the construction period by reassembling the process each time with a separate contractor such as a general contractor, FF&E, and artwork, which is a construction work, and by subdividing the construction content into areas so that it can be worked in turns.

project member

sales
Masayuki Yoshimori, Daitsugu Takatori
construction drawing
Yoshikazu Shimamura, Bungei Yamada, Akira Yamamoto, Yuko Shimoji
Production and Construction
Mikiya Fujitaka, Ryokazu Hirowa, Naoki Sugai, Daisuke Tanaka, Kazuma Shishido, Shuya Hashimoto

Basic information

open

2025

location

Tokyo

client

East Japan Railway Company

solution

building execution

Facility and employee information is current as of the time of opening. Please see the facility's website for the latest information.

What's NewSearch by new achievements

PAGE TOP
Contact us

Please contact us using the button below if you have an inquiry, want to request a quote or request documents.
We have created a separate “FAQ page” that lists the most common questions we are asked.
Please take a look at this page if you have a question.